top of page

AVAIL FREE On-Line Trial Service on Operations Optimization!

Videos

Enjoy our video tips to improve your team work.

Videos

Enjoy our video tips to improve your team work.

Videos

Enjoy our video tips to improve your team work.

SCM.png
Organizing Image 5.png
Opti360 Project Management

 

Base on Agreed KRAs of Client, OPTI360 Team will do almost all of the work. However, Client with its Group will do the temporary set-up with our assistance, simulation to final stage (met agreed KPI Parameters) for day to day applications.  

Opti360 Mgt. Consultancy

Base on Agreed KRAs of Client, OPTI360 Team assist the Client with group on a once or twice a week from Drawing Board (draft) to their Production of the 3i Systems up to Final Set-Up (met KPI Parameters), Dry Run until Regularly running.

Image Webinar .png
Opti360 Mgt. Workshops

A Hands-On Management Workshop aimed at equipping participants in developing its Kit (based on KRAs enrolled) that may be applied in their department or division. FREE limited hours on-line assistance

Cost Efficiency 2.jpeg
Factory Plant 2.png

DCs, Factory Plants, XDCs

Requirements 15k Packs a day

Before

1. Over Time of 24 hours a day. Carried over.

2. Last Dispatched around 9am to 10am. At times reached 2pm

3. Significantly experienced Backloads, Unserved, Wrong served, others 

After

1. Usually, No OT

2. Last Dispatched around 6am to 7am 

3. Rarely encountered Backloads, Unserved, and so on

Recent Posts
Check back soon
Once posts are published, you’ll see them here.
bottom of page